Storage for Factories Guide

A factory approaches storage differently from a home, because a factory's problem is a load profile: demand that spikes with production, idles at night and changes with shifts and seasons. This guide follows the order a factory should work in, from the meter to the enquiry.

Work in this order

The cabinet format documented in this catalogue fits this workflow because it is planned per project: assembled and integrated around the site's duty and load. The factory planning notes in the blog take the same ground from the experience side, including the mistakes that only show up after installation.

Expect the first conversation to be about your data, not about a model. A supplier who asks for the load profile before quoting a rating is following the same order this guide sets out.